Please refer to the document attached
- Annex 1: Technical Drawings
- Annex 2: Technical Specification
- Annex 3: Bill of Quantities
- Annex 4: Environment and Social Management Framework (ESMF)
- Annex 5: Environmental and Social Management Plan (ESMP)
A. Summary of Requirements
The Scope of Works for ES01-04, ES02-04, ES03-03, and ES03-04 generally includes, but is not limited to, the following Civil, Structural, and Architectural (CSA) and Mechanical, Electrical, and Plumbing (MEP) works, as detailed in the Specifications, Drawings, and Bill of Quantities:The Scope of Works for ES03-03 and ES03-04 generally includes, but is not limited to, the following Civil, Structural, and Architectural (CSA) and Mechanical, Electrical, and Plumbing (MEP) works, as detailed in the Specifications, Drawings, and Bill of Quantities:
ES03-03 — Napong Village, Khongsedone District, Salavan Province
Outdoor Works: Landscape, civil works, drainage, electrical distribution, and water supply infrastructure serving the site.
Building A — Evacuation Shelter / Hall (160m²) — Retrofit: The existing structure was built without a roof; the retrofit scope covers installation of the roof structure together with all architectural finishes and electrical systems.
Building B — WC Building (60m²) — New Construction: Full structural, architectural, electrical, and plumbing works for a new sanitary facility.
ES03-04 — Namtheng Village, Khongsedone District, Salavan Province
Outdoor Works: Landscape, civil works, drainage, electrical distribution, and water supply infrastructure serving the site.
Building A — Evacuation Shelter Hall (109m²) — Retrofit: Existing structure includes all structural works, brickwork, and doors and windows; retrofit scope covers plastering and electrical works.
Building B — Evacuation Shelter Hall (109m²) — Retrofit: Existing structure and roof frame are complete but roof materials are beyond serviceable life; retrofit scope covers full roof replacement together with all architectural works and electrical systems.
Building C — WC Building (60m²) — New Construction: Full structural, architectural, electrical, and plumbing works for a new sanitary facility.