MAGP Background:
The Merged Areas Governance Programme (MAGP) is a comprehensive governance initiative that focuses on technical assistance and implementation support to the Government of Khyber Pakhtunkhwa (GoKP) in three main areas: 1) accelerated development with an emphasis on the delivery of basic services; (2) border governance and connectivity; and (3) support to local governance systems. The overall objective of the Programme is to enhance the capacity of the GoKP to successfully integrate the Merged Areas (MAs) and strengthen border governance and cross-border connectivity by extending laws, policies, and strategies; planning, designing, and delivering development initiatives; and implementing inclusive local government systems. An emphasis is placed on inclusive development, to ensure that marginalized population groups benefit from development in the MAs, as well as on disaster-risk reduction and improved risk management, to help prevent, mitigate and/or address the effects of climate change and other risks.
Background of the proposed project:
Under its second pillar and as part of its approved Annual Work Plan 2023, MAGP is supporting GoKP in developing robust, responsive and inclusive local and district governance systems in the Merged Areas that improve the lives and livelihoods of communities along the Afghan-Pak border. This includes working closely with district administrations for enhanced service delivery, community resilience and connectivity at local levels, contributing to increased citizen-state trust and stability in the MAs. To that end, MAGP seeks to support establishment of a pre-cast concrete bridge at Village Mithai in district Mohmand to connect remote communities (estimated population 18,000 residents), scattered across the hilly terrain of the Bazai Village Council, to the district administration and other key services (including education, health and civil registration services) in the district.
Details of the proposed project:
The topography of the area is composed of hilly terrain as can be seen in Figure 1. The existing road alignment passes through steep slopes due to the natural topography of the area.
The already existing abutments present are in deteriorated condition and without superstructure. Due to the steep slope in the stream, the velocity is high which can be observed due to the movement of heavy boulders during flash flooding. The high flood level was observed from the watermarks on the existing deteriorated abutments.
Further details related to the bridge can be found in annexure D as: Site Plan, Survey report and Geotechnical report.
Negotiation Document(s)
(Before Accessing other negotiations Document(s), please click on this link)
If you already have a supplier profile, please login to the Supplier Portal, then search for the negotiation using the reference number UNDP-PAK-00531, following the instructions in the user guide.
To help us track our procurement effort, please indicate in your email where (tendersglobal.net) you saw this tender/procurement notice.